• ClipSaver
ClipSaver
Русские видео
  • Смешные видео
  • Приколы
  • Обзоры
  • Новости
  • Тесты
  • Спорт
  • Любовь
  • Музыка
  • Разное
Сейчас в тренде
  • Фейгин лайф
  • Три кота
  • Самвел адамян
  • А4 ютуб
  • скачать бит
  • гитара с нуля
Иностранные видео
  • Funny Babies
  • Funny Sports
  • Funny Animals
  • Funny Pranks
  • Funny Magic
  • Funny Vines
  • Funny Virals
  • Funny K-Pop

DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080 скачать в хорошем качестве

DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080 1 month ago

BR280

Tunel

Duplicação

Joinville

Ponte

Viaduto

Estrada

Gopro

Rodovia

Avião

Aeroporto

Jaragua do Sul

Schroeder

Obras

Governo

Porto

Guaramirim

BR101

Viamar

weg

elevado

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080
  • Поделиться ВК
  • Поделиться в ОК
  •  
  •  


Скачать видео с ютуб по ссылке или смотреть без блокировок на сайте: DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080 в качестве 4k

У нас вы можете посмотреть бесплатно DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080 или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:

  • Информация по загрузке:

Скачать mp3 с ютуба отдельным файлом. Бесплатный рингтон DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080 в формате MP3:


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса ClipSaver.ru



DUPLICATION BR280 LOT 2 1 UPDATE 82% COMPLETE HD1080

In Santa Catarina, the National Department of Transport Infrastructure (DNIT) is making progress with the works to adapt and widen 73.9 kilometers of the BR-280/SC highway in the north of the state, between São Francisco do Sul and Jaraguá do Sul, one of the state's main transport and transportation highways. With a total budget of around R$1.7 billion, as provided for in the PAC, the project reached a significant milestone in November with the start of paving of the double tunnel in Morro do Vieira. Part of the Guaramirim and Jaraguá do Sul bypass, the tunnel will connect the hill to the Tifa Schubert region, providing a safer and more efficient route for local and long-distance traffic. This progress represents an important step in the project, which seeks to expand the highway's capacity to support the increase in vehicle and cargo traffic. In addition to this tunnel, the project, in lot 2.2, includes the construction of several other Special Works of Art (OAE), such as viaducts, bridges and wildlife crossings. Of these, at least four have already been completed. The widening and bypassing of the highway were planned to improve mobility in the region, known for its intense industrial and agricultural activity. BR-280/SC is a strategic route for the flow of products, connecting companies in the interior to the coast and ports of Santa Catarina. With the new route bypassing urban areas, it is expected that heavy truck traffic will be diverted from city centers, reducing congestion and accidents, which directly benefits the quality of life of residents and the safety of those who use the highway. Progress of works in the three lots The duplication works on BR-280/SC are divided into lots 1 (26% completed), 2.1 (82% completed) and 2.2 (67% completed), and drivers who travel through the region should pay attention to the signs, as in several stretches there are already detours or permanent closures being implemented, in addition to those places where traffic is being redirected due to the works. The interventions on BR-280/SC will impact up to 50 thousand vehicles that travel through the region daily, including residents of the cities of Araquari, Balneário Barra do Sul, Guaramirim, Jaraguá do Sul, Joinville, São Francisco do Sul and Schroeder. The highway connects the region to other states via BRs 101, 116, 158 and 163. Link Chiesetta Alpina and Rampa Parapente    • CHIESETTA ALPINA & RAMPA DE PARAPENTE...   Link Linguado BR280 Ilha de São Francisco do Sul    • LINGUADO BR280  ILHA DE  SÃO FRANCISC...   #araquari #balneariobarradosul #guaramirim #jaraguadosul #joinville #saofranciscodosul #schroeder #br101 #works #drone

Comments
  • NEW ARAQUARI BRIDGE COME TO JOINVILLE WITHOUT TAKING BR280!!! 7 days ago
    NEW ARAQUARI BRIDGE COME TO JOINVILLE WITHOUT TAKING BR280!!!
    Опубликовано: 7 days ago
    29591
  • COMPLETED WORKS ITAGUAÇU & CAPRI in SÃO FRANCISCO DO SUL... 8 hours ago
    COMPLETED WORKS ITAGUAÇU & CAPRI in SÃO FRANCISCO DO SUL...
    Опубликовано: 8 hours ago
    349
  • DUPLICAÇÃO da DONA FRANCISCA & CONSTRUÇÃO da AREA DE ESCAPE na SERRA  SC418    HD1080 2 months ago
    DUPLICAÇÃO da DONA FRANCISCA & CONSTRUÇÃO da AREA DE ESCAPE na SERRA SC418 HD1080
    Опубликовано: 2 months ago
    6334
  • Operação Fronteira Brasil 4 temporada episódio 2 2 months ago
    Operação Fronteira Brasil 4 temporada episódio 2
    Опубликовано: 2 months ago
    2449622
  • Ponte de Guaratuba: O Que Vai Mudar na Cidade — E Por Que Você Precisa Estar por Dentro! 12 days ago
    Ponte de Guaratuba: O Que Vai Mudar na Cidade — E Por Que Você Precisa Estar por Dentro!
    Опубликовано: 12 days ago
    9472
  • почему зумеры не бухают 1 day ago
    почему зумеры не бухают
    Опубликовано: 1 day ago
    289299
  • Аль Капоне, Клан Кеннеди и ЦРУ. Секреты Ирландских банд | ФАЙБ 9 hours ago
    Аль Капоне, Клан Кеннеди и ЦРУ. Секреты Ирландских банд | ФАЙБ
    Опубликовано: 9 hours ago
    105480
  • Transamazônica: A História da Pior Rodovia do Brasil 1 year ago
    Transamazônica: A História da Pior Rodovia do Brasil
    Опубликовано: 1 year ago
    203925
  • JOINVILLE TERÁ 1°BAIRRO PLANEJADO    & TEM NOVO BINÁRIO  CONCLUIDO 2 months ago
    JOINVILLE TERÁ 1°BAIRRO PLANEJADO & TEM NOVO BINÁRIO CONCLUIDO
    Опубликовано: 2 months ago
    8626
  • DUPLICAÇÃO BR280  MEGA TÚNEL MORRO DO VIEIRA em FASE DE CONCLUSÃO    HD1080 4 months ago
    DUPLICAÇÃO BR280 MEGA TÚNEL MORRO DO VIEIRA em FASE DE CONCLUSÃO HD1080
    Опубликовано: 4 months ago
    24477

Контактный email для правообладателей: [email protected] © 2017 - 2025

Отказ от ответственности - Disclaimer Правообладателям - DMCA Условия использования сайта - TOS