У нас вы можете посмотреть бесплатно Wisconsin // Dockyard Building Timelapse // World of Warships или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Hello there :) Building Timelapse of the new battleship Wisconsin in Word of Warships. ------------------------------------------------------------------------------------------------------------------------ Description of each assembly step: English: 1. Assembly of the double floor, installation of the torpedo protection bulkheads and frame sections in the citadel area 2. Laying the double floor, installing the armor plate sections in the citadel area, installing the barbette foundations 3. Installation of the frame sections in the stern, installation of the transverse main bulkheads in the citadel area and in the stern, installation of the stern and citadel plating 4. Installation of the transverse bulkheads, the frame sections, the plating and the double floor in the forecastle 5. Installation of the transverse bulkheads, the frame sections, the double bottom and the armor in the stern 6. Installation of the frame sections, the plating and the decks in the forecastle 7. Installation of the turbines and the lower level of the barbettes, installation of the screw shaft hubs and part of the deck framing 8. Installation of the boilers and the deck framing in the citadel area 9. Installation of the frame sections, the interior partitions and the framing and floor for the lower deck in the forecastle 10. Installation of the frame sections, the interior partitions and the plating as well as the underdeck framing and the floor in the stern, installation of the second level of the stern barbed 11. Installation of the frame sections, the interior partitions and the plating as well as the underdeck framing and the floor in the forecastle, installation of the second level of the forecastle bar beds 12. Installation of the interior partitions and deck framing in the citadel area, installation of the armor plates on the barbettes, laying of the armor deck plates in the stern 13. Laying the splinter protection deck in the citadel area, installing the frame sections, the interior partitions and the deck floor in the forecastle 14. Laying the armored deck in the citadel area, completing the transverse bulkheads and frame installation in the stern, completing the hull armor 15. Installation of the interior partitions as well as the framing and the floor for the second deck in the fore and aft 16. Installation of the interior partitions and the main deck framing in the citadel area 17. Installation of the roll keels, the rudders, the ship's propellers and the hawsepipes, installation of the interior partitions and framing in the stern and fore ship 18. Laying the main deck, installing mooring equipment 19. Installation of the first level of superstructures 20. Launch of the ship 21. Installation of the second level of superstructures 22. Installation of substructures and supporting structures for the main battery towers, installation of small equipment on the main deck 23. Installation of the third level of the superstructure 24. Installation of the fourth level of superstructure and the main battery guns 25. Installation of the fifth level of superstructure and multi-purpose guns 26. Installation of the sixth and seventh levels of the superstructure 27. Installation of the eighth and ninth levels of superstructure, installation of small equipment, winches and boat racks 28. Installation of the tenth level of superstructures, installation of chimney covers, small equipment and ventilation and lighting elements 29. Installation of the eleventh level of the superstructure and the main masts, installation of the radar systems, the boat cranes and the boats, installation of the catapult and the crane in the stern, as well as elements of the ventilation system and small equipment 30. Laying the wooden floor and painting the decks, installing the fire control systems, the secondary battery and anti-aircraft guns, the rigging, the antenna systems, the railings, the life rafts and small equipment Translated with help from Google Translator. I am sorry for possible Translationmistakes. Enjoy the video :) ------------------------------------------------------------------------------------------------------------------------ Music World of Warships - marine base (Ships for Victory-Event) // Soundtrack All rights reserved to Wargaming