У нас вы можете посмотреть бесплатно 3 Projects of Sargodha|Faisalabad Sargodha Road|85 Jhal Sargodha|Sargodha Flyover Project|Qaichi Mor или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
This video is about latest update of 3 mega Projects of Sargodha City. The dualization of the Faisalabad-Chiniot-Sargodha road, from Kamalpur Interchange to Tehsil Chowk Chiniot, covering 24 km, is progressing well. In Section-I (8.53 km) of District Faisalabad, clearing work has been done on about 4 km on one side and 5 km on the other. Soil work is also ongoing, covering nearly 4 km on both sides. چنیوٹ اور فیصل آباد کے عوام کا دیرینہ مطالبہ، وزیراعلیٰ پنجاب Maryam Nawaz Sharif کی خصوصی ہدایات پر فیصل آباد-چنیوٹ-سرگودھا روڈ، کمال پور انٹرچینج تا تحصیل چوک چنیوٹ، دو رویہ سڑک کی تعمیر و بحالی۔ عوام کو روزانہ کی مشکلات سے نجات، وقت اور ایندھن کی بچت کےساتھ ساتھ اب آمدورفت میں سہولت۔ #chiniot #Faisalabad #Sargodha #roadsrestorationprogram #developingpunjab #roadsinfrastructure Commissioner Sargodha Inspected Under-Construction Flyover 47 Pull Sargodha Commissioner Sargodha, Muhammad Ajmal Bhatti, along with Deputy Commissioner Captain (R) Aurangzeb Haider Khan, conducted an inspection of the under-construction 47 Pull Flyover to review the quality and progress of the ongoing work. The Commissioner called a meeting on-site with officials from Highways, FESCO, Cantonment Board, PTCL, Sui Gas, and the Municipal Corporation to receive detailed briefings on the progress of their respective tasks. Sui Gas officials reported the completion of line relocation, while FESCO confirmed the removal and relocation of electric poles, with wire installation to commence on Monday, aiming for completion in 20 days. Cantonment Board officials announced the replacement of the sewer line from Daewoo Bus Terminal to Qainchi Mor, with connections expected to be completed within two weeks. EXEN Highways shared that an additional Rs. 275 million has been released for the flyover project, and work is progressing as scheduled. The Commissioner noted the unauthorized construction of a private bakery on the flyover route, which obstructs road construction. A notice was issued, giving the owner seven days to comply with the approved plan, with warnings of action in case of non-compliance. The Commissioner also directed measures to ensure smooth traffic flow on both sides of the flyover and advised shopkeepers to dismantle unauthorized constructions on the rainwater drains, warning that non-compliance will result in municipal action. Emphasizing the need for timely drainage work along University Road, the Commissioner urged swift action to prevent waterlogging. #sargodhanews #47pullflyover #infrastructuredevelopment #urbanplanning #commissionerinspection #pakistanconstruction #municipalcorporation #fesco #suigas #cantonmentboard #publicsafety #urbandevelopment #punjabgovernment #trafficmanagement