У нас вы можете посмотреть бесплатно Mercedes-Benz Vans eSprinter Production | Plant Dusseldorf | или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
The Mercedes-Benz Dusseldorf plant celebrated the start of production of the Mercedes-Benz eSprinter with an event for employees and invited guests. As guests of honour, Armin Laschet, Minister President of North Rhine-Westphalia, and Thomas Geisel, Lord Mayor of the state capital Dusseldorf, recognised this step and the commitment which Mercedes-Benz has demonstrated to its Dusseldorf site. The Stuttgart-based manufacturer has been building its globally successful vans in Dusseldorf since 1962. Ever since, the plant has continually developed to become in recent years the leading Sprinter plant worldwide and to serve as a benchmark for the other locations. The implementation of future-oriented technologies and production methods as well as their consistent testing benefits the entire production network of Mercedes-Benz Vans. The Mercedes-Benz eSprinter is intended to cover the broadest possible range of use in urban mobility. Accordingly, it is initially being offered as a panel van with high roof and a permissible gross weight of 3,500 kilogrammes. Its maximum loading volume is 10.5 m3, the same as for the Sprinter with combustion engine. Similar to the entry-level diesel engine, the electric drive in the eSprinter drives the front wheels with an output of 85 kW and a torque figure of up to 300 Newton metres. A flexible payload and battery concept moreover allow adaptation to individual needs for practical use as the customer can choose between three or four battery units. Equipped with a battery capacity of 55 kWh, its range is an estimated 168 kilometres, with a maximum payload of 891 kilogrammes. A second battery option takes into account other priorities in the use parameters: three instead of four battery units with a capacity of 35 kWh allow a range of around 115 kilometres 1, 2. In return, the maximum payload increases by around 140 to approximately 1040 kilogrammes. The integrated fast-charging function provides for more flexibility; 80 percent of the battery charge can be replenished within 30 minutes. The maximum speed can be configured to suit the task at hand: the top speed can be set at 80 km/h, 100 km/h or even as high as 120 km/h, if speed is essential. The Dusseldorf Mercedes-Benz plant, established in 1962, is the world's largest van plant of Daimler AG. A production area of round 188,000 square metres (body shop, paint shop and assembly) encompasses the manufacture of the closed model designations of the Mercedes-Benz Sprinter – the founder of the large van segment. Production of the new Sprinter in Dusseldorf began in March 2018. Altogether, well over four million vans have been produced in Dusseldorf to date. As the lead plant for worldwide Sprinter production, Dusseldorf plays a leading role within the global production network of Mercedes-Benz Vans. With over 6,600 employees and around 145 trainees, the plant is one of the biggest industrial employers and trainers in the region. More than 4.6 million vehicles have been produced in Dusseldorf to date. Since 2018, production of the new Sprinter has also taken place there, with over 200,000 units having already left the assembly line, ready to enter into their daily service all over the world. The production of the fully electric eSprinter marks the beginning of a new era in Dusseldorf. Building the eSprinter in Dusseldorf is a next step for the future of the plant and for the manufacturer itself. Over the past years, already in advance of production of the new Sprinter and the new drive system variants, Mercedes-Benz Vans has invested a total of around 330 million euros in the technical expansion of production, while taking into account the fact that, in future, the manufacture of both conventionally operated and fully electric vehicles will be built on a single production line. The result will be enormous flexibility and the ability to meet both customer and market requirements. Besides the comprehensive investments in the production systems, the plant has also been massively investing in the basic and advanced training of its own employees. Since the decision was made to build the eSprinter in Dusseldorf, the plant has become the competence centre for electric drives and has developed the requisite expertise. To date over 2,400 employees have been trained for handling and assembling the high-voltage technologies.