У нас вы можете посмотреть бесплатно BIO-UV REACTOR - Installation & Maintenance - Water treatment for RESIDENTIAL POOLS или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
We are going to present you in an easy and fast way the key factors of successful installation with confidence. Carefully watch the diagram before the installation. 1 - INSTALLATION OF THE BIO-UV REACTOR Install the reactor so that the water inlet is always at the bottom and exit at the top. Avoid installing the reactor in the lying down position as it needs to stand still. You have to define in your local technical unit first well the place is going to be. After realizing the bypass, connect the union fitting with a specific pliers in order to tighten the fittings 2 - INSTALLATION OF THE COMBIPOOL Place the sleeve where all the injection valves are ready installed and the valve which concerned the pH analyst probe. Notice that both injections are opposite on the same valve Connect the probe with a unit Unscrew the front face Place the polyethylene opac on the injection valves and then after positioning the strainers and putting them in the corresponding drums position the PVC crystal pipe on the aspirating tubes. Be careful! You must respect each jump according to every regulation Fix your front face again. The electrical connection is going to proceed through the filter and control box: Dismount the unit Check your two plugs and connect your units on the a1 and a2 filtration plots which are located in the filter and control box and then connect the combipool After installing on the wall, the electrical ballasts supply, connect the UV reactor then start the entire installation. You will notice that your UV lamp is switch on through the white transplant pipe. The dozing pump is now connected 3 - STARTING UP THE COMBIPOOL Unscrew the front face again Take the battery off and insert it on its connector this battery is a running reserve. fix it inside the unit as shown and switch it on again your combipool. The elements will be displayed and the calibration is going to be made Close the front face now. All is now ready, and you can observe perfect installation 4 - CHANGING THE BIO-UV LAMP The BIO-UV system maintenance is easy and fast. Unplug the unit from its plug then switch off the unit. The lamp is now switched off Again drain the unit by unscrewing the valve plug and once entrers empty of water unscrew the top Unplug the lamps and unscrew the ceiling nuts Grab the lamp by its connector and carefully take out the in plugged UV lamp. Be careful to keep the UV lamp very straight by taking it gently not to break it Unscrew the ceiling nut take out the ball quartz and clean it with some vite white vinegar and a soft rag in order to remain out the traces Place it again in the unit by putting your finger inside so that it would be perfectly fit in the hole in the unit and that you can feel of pneumatic effect when you pressure mean it Screw back again the ceiling nut without forgetting to put the joint back Insert back the limp and reconnected this one has an arranged slot which will prevent from positioning it in the wrong side. Do not force it, the four pins have to go in the connector by themselves 5 - INSTALLATION OF THE BIO-UV TEMPO DOSING PUMP AND THE BIO-UV PH AUTOMATIC REGULATOR First in start the BIO-UV temper on the wall which provides smoke doses of active oxygen every day Then you will also install the BIO-UV pH automatic pressure regulator respecting carefully the inspiration and injection pipes Follow us! Web site : https://en.bio-uv.com/ Facebook : / biouvgroup Linkedin : / bio-uv-group Twitter : / bio_uv_group