У нас вы можете посмотреть бесплатно BSC Power Weeder 212E | How to Install | How to Maintain | Complete User Guidance или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Below is a summary of the machine's functions and the step-by-step installation instructions: 1. Product Overview This tiller is a multifunctional agricultural tool designed for various field tasks: Rotary Tillage: Tilling in both dry land and paddy fields Ditching & Ridging: Creating furrows for planting. Transportation: Capable of short-distance hauling with a rated load of 250kg. Multifunctional Work: Can be attached to external tools for bailing, sprinkling, chemical spraying, and power generation. 2. Installation Instructions Follow these steps to assemble the machine from its "unpacked" state. Step 1: Main Body & Wheel Assembly Support the Unit: Position the main body of the tiller securely. Install Running Wheels: Slide the wheels onto both sides of the hexagonal driving shaft. Secure: Fix each wheel using two M8x55 bolts and M8 nuts Step 2: Handlebar Installation Align Discs: Turn the two fluted discs on the handlebar to the right so they align with the disc plate. Secure Handlebar: Connect the assembly using M10x140 auxiliary bolts and 16-gauge gaskets. Cable Routing: Use wire clips to fix the clutch cable, gun (throttle) cable, and backshift cable along the handlebar. Step 3: Shift Lever & Fenders Shift Lever: Remove the pins between the shift lever and the connecting shelf. Adjust the direction by 180° and re-secure. Mud Fenders: Install the side frames and protection frame components. Attach the side protection panels and, if necessary, the specific paddy field protection panels. Step 4: Cable Adjustment (Critical for Safety) Clutch Cable: Ensure the screw rod is rotated to its shortest position before threading the cable into the clutch plug behind the gearbox. Adjust until the handlebar repositions itself correctly via spring force. Throttle (Gun) Cable: Turn the switch to the "fastest" position. Thread the wire-rope into the engine gun pole and fasten securely 3. Safety & Pre-Operation Checklist Before starting the engine for the first time: Check Oil Levels: Ensure the engine and gearbox are filled with the recommended oil (e.g., SAE10W-40 or No. 20 lube) Neutral Gear: ALWAYS ensure the shift lever is in the neutral position before starting. Tighten Bolts: Check all connection bolts, especially those on the flange and engine frame, to ensure they are torqued correctly. 4. Technical Maintenance Schedule Every Use Check for loose bolts, oil leaks, and clean mud/grass. First 5 Hours Drain all oil from the gearbox and crankcase and replace with clean oil. Every 150 Hours Wash gearbox, change lube oil, and adjust the clutch/shift systems. Every 1000 Hours Inspect gears and bearings for heavy wear; replace if necessary. #BSCPower #BSCPowerWeeder212E #Weeder212E #PowerWeeder #MiniTiller #TillerMachine #AgricultureMachine #FarmingTools #FarmEquipment #RotaryTiller #KhetiKeUpkaran #IndianFarming #OrganicFarming #WeederInstallation #WeederMaintenance #HowToInstall #MachineMaintenance #FarmMachineryIndia #AgricultureIndia