У нас вы можете посмотреть бесплатно Trishuli Hydropower & Upper Trishuli‑1 | Nepal’s Clean Energy Game‑Changer🔥 или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
🌊 Trishuli Hydropower Station – Nepal’s First Peaking Run-of-River Power Plant Located in Nuwakot District on the banks of the Trishuli River, the Trishuli Hydropower Station is a historic milestone in Nepal’s electricity generation. Built in 1967 with support from the Government of India, the plant started with a capacity of 21 MW and was later upgraded to 24 MW (7 units × 3.5 MW each). --- ⚙️ Key Technical Facts Type: Peaking run‑of‑river plant (semi‑reservoir) Hydraulic Head: ~51.4 m Annual Generation: ~163–304 GWh (design capacity: 163 GWh; FY 2021/22: 137 GWh) Ownership & Operation: Nepal Electricity Authority (NEA) --- 🚧 Renovation & Modernization 1995: Upgraded to 24 MW 2023: Major renovation began with: New bypass canal (1,200 m, 50 m³/s) to avoid reservoir sedimentation Modern equipment for higher efficiency Target to maintain generation during restoration works --- 🌊 Cascade Projects on Trishuli River Along the Trishuli River, several cascade projects support Nepal’s grid: 1. Devighat Hydropower Station (14.1 MW) – Commissioned 1984; takes water from Trishuli tailrace. 2. Upper Trishuli 3A (60 MW) – Commissioned 2019; supports peak demand in Kathmandu; built with Chinese financing. --- 🚀 Upper Trishuli‑1 Hydropower Project Nepal’s upcoming mega project on the same river: Capacity: 216 MW (3 × 72 MW Francis turbines) Annual Output: ~1,533 GWh (≈ 20% national generation) Location: Rasuwa District (~70 km north of Kathmandu) Investment: US $647 M (financed by IFC, ADB, AIIB, KOEN, KIND, KOICA, NEA) Design: 2.1 ha diversion dam → 2 intake tunnels → ~9.8 km headrace tunnel → underground powerhouse Operation Model: 35‑year BOOT; electricity sold to NEA via 30‑year PPA --- 🌏 Impact on Nepal’s Energy Reduces load-shedding risk in dry season Boosts clean energy share in the grid Strengthens Kathmandu power supply during peak demand Supports economic growth through stable electricity --- ⏱ Suggested Timestamps 00:00 Intro & History 01:45 Technical Specs of Trishuli Station 03:10 Renovation & Bypass Canal 05:00 Devighat & Trishuli 3A Projects 07:30 Upper Trishuli‑1 Overview 10:00 Economic & Environmental Impact 12:30 Nepal’s Energy Future --- 🔥 Call to Action If you found this video helpful, 👉 Like 👍 | Comment 💬 | Share 📤 | Subscribe 🔔 for more videos about Nepal’s energy, infrastructure, and future development! --- 📌 SEO Hashtags #TrishuliHydro #UpperTrishuli1 #NepalEnergy #HydropowerNepal #CleanEnergy #NepalDevelopment #HydropowerProjects #KathmanduElectricity