У нас вы можете посмотреть бесплатно ENTIRE FIRST YEAR of Barn DIY / Gold-Rush Era Restoration или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Top 15 videos from 2025 from the beginning of the move-in to the end of the years storms. This is a full-length Movie of the Barn’s restoration in the 1st year, featuring the best of 2025’s Projects, for the Barn -ForTheBarn #craft #cat #craftideas #diycraft #diy #woodworking #california #wood #barn #diyideas AI Summary This video offers a comprehensive look at the first year of a barn's DIY restoration, featuring various projects from early 2025. Here's a breakdown of the key restoration phases: • Flooring Installation (2:59-6:17): The creator installs a new floor in the barn's entryway to mitigate dust and mud, utilizing repurposed wood from a demolished play structure. • Water Leak Repair (6:46-14:52): The video details the process of identifying and fixing an underground water leak, which involved replacing sections of PVC and copper pipes. • Electrical Panel Swap (15:11-35:25): The original electrical panel from 1977 is replaced with a new one, involving careful disconnection, labeling of wires, and re-wiring. • Another Water Line Repair (36:08-47:28): The creator addresses another water leak in the main water line, showing the steps to shut off water, cut out the faulty coupler, and install a new PVC piece. • Water Heater Restoration & Bathroom Renovation (48:47-58:50): The water heater is drained, refilled, and powered up to provide hot water. The bathroom also gets a new light fixture and a thorough cleaning of the shower floor. • Washroom & Sink Upgrade (59:14-1:03:19): The old washroom is renovated with a new tiled floor and a larger sink. • Trim Installation (1:03:23-1:04:49): New wood trim is installed along the edge of the carpet and the newly laid floor in the washroom area.