У нас вы можете посмотреть бесплатно Steam boiler inspection methods или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
#EngineeringHub #boilerinspection Inspection of Steam Boiler is a must activity should be carried out as per Govt. guidelines. Steam is required for power generation through a steam turbine or steam engine. Steam is also required for engineering process work, hot water supply, and heating installations etc. So, a boiler is a closed vessel where combustion of fuel produces heat to convert water into steam at the desired temperature and pressure. For the safe operation of the boiler, it should be inspected by various methods and at various stages. 01) Inspection before registration Every new boiler must get registration from government authority. So this is the first inspection carried out on a new boiler. For this inspection, the boiler is completely stripped off all its mountings, coverings etc. Each and every part is carefully examined for defects due to design, workmanship or transportation. If any defects found, these are noted in the registration book. The working pressure of the boiler is fixed after testing its various parts and a certificate is issued for the results obtained. After various satisfactory tests, the boiler is registered and a registration certificate is issued. 02) Annual Inspection Generally, boiler inspection is carried out annually. In the case of an accident or abnormal complaint, it should be done at any time. The boiler is inspected from internally and externally for any defects which may develop during the course of its working. 03) Hydro Test The hydraulic test is carried out to inspect the tightness of joints, fittings and the leakages from the repaired parts. 04) For the new boiler A) The hydraulic pressure applied will be 200% of the working pressure and it should not leak under this pressure. B) When the boiler is working above 100 lbs/inch square, the hydraulic pressure applied for a test is 150% + 50 lbs/inch square and the boiler should not leak at any spot under this pressure. 05) Steam Test To check the setting of the safety valves at the working pressure, this test is carried out. 06) Inspection in Presence of Steam This type of test is very rare but when boiler cannot stop due to any reason, this test carried out. 07) Internal Inspection When the boiler is small in size and when inspector cannot enter inside for close inspection of internal parts this type of test is carried out. 08) Causal Inspection To check out that the boiler owner is operating the boiler according to the boiler act, the surprise visits from time to time are carried out for inspection. 09) Accident Inspection If due to any reason accident took place, the boiler inspector holds an inquiry to fix the reasons for an accident. For detail information on Steam Boiler Inspection, visit https://www.engihub.com/inspection-of... Get the Best Engineering Books at BIG DISCOUNT, Click Here, https://www.engihub.com Also, like us on / bestengineeringhub