Русские видео

Сейчас в тренде

Иностранные видео




Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса ClipSaver.ru



Delhi Mumbai Expressway Maharashtra Update | Virar JNPT Progress| Package 14

1350 km Delhi – Mumbai Expressway project is a partially operational & under construction 8 lane access-controlled road with a route connecting DND in Delhi with JNPT in Mumbai. It has been designed with a speed limit of 120 km/hr and provision to expand to 12 lanes in the future. This new greenfield expressway was approved for construction under the Bharatmala Pariyojana programme in 2017, and Prime Minister Narendra Modi laid its foundation stone on March 9, 2019. Delhi – Mumbai Expressway with closed tolling will connect 5 states of Haryana (80 km), Rajasthan (380 km), Madhya Pradesh (370 km), Gujarat (300 km) and Maharashtra (120 km). Its alignment will reduce the distance between Delhi and Mumbai by around 150 km and travel time to 13 hours from the current 24 hours. Besides that, the expressway will lead to considerable fuel savings, better ride quality and safety over the existing NH-48 highway. In This Video You will find the December 2024 progress update of Delhi Mumbai Expressway Virar-JNPT Section Package 14 progress. Connect me on- Twitter- / jaideepkane Instagram- / jaideepkaneyt #delhimumbaiexpressway #delhimumbaiexpresswayupdate

Comments