У нас вы можете посмотреть бесплатно [Cab View] SBST Bombardier Movia C951A Set 9089 From Botanic Gardens to Bukit Panjang MRT Station или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Date Filmed: 5 January 2026 Just Right After I Finish Riding The Thomson-East Coast Line as I was there for Excursion, I decided to come here and Ride Back To Bukit Panjang MRT Station. You can also see some of my friends face being featured at the Start. Eventually The Botanic Gardens Is The Place That I went there For Picnic With My Other Friends. So While I was doing trainspotting, I was Thinking Which C951 Set Would It Be But Then It Turns Out That C951A Set 9089 Will Be The Ride For Today. So then this is the 4th Last Set Being Built For The C951 Train Fleet As The Additional Ones Are Consists Of 19 Trains Which Are Fleeted From Set 9074 To 9092 Which Brings To The Total To 92 Trains Altogether. This Area Is Part Of The Downtown Line Stage 1 Which Was Opened On 27 December 2015 To The Public Which Consists Of 12 MRT Station Since Hume MRT Station wasn't open until 28 Feb 2025 Due To The Low Ridership at that time. As Of Now, There are 35 Operation MRT Stations As Hume MRT Station has Already Opened Up For Passenger Service Last Year In 2025 as This Is My First C951 Train Ride In 2026. Every time got staff being spotted at the front of the train cab which is as similar as the North East Line because it needs to get monitored every time to ensure a smooth ride and also needed in case of any emergency, The Staff will Manual Drive the train. This is One of the Most Least Breakdown Of the MRT Lines Ever In Singapore. But then Since Because I ask The SBS Transit Staff If I could Film The Front View, I Got The Chance To Film It Once Again For The Front Cab and Most of the times the tunnel lights were being activated at that time during the Normal MRT Operation Hours. ↓Train Information↓ Brand: Bombardier Model: Bombardier Movia C951 Build By: Changchun Bombardier Railway Vehicles Co. Ltd. Year Build: 2017 Year in service: 2017 Set: 9089 TRN: N/A Destination: Bukit Panjang Starting Point: Botanic Gardens Ending Point: Bukit Panjang Rating: 100+/100 Please do not Upload or use my videos without any permission, As well as Reporting my channel and any of my videos. Also Please don't dislike and No writing any hate comments! Any Hate comments will be removed at any time. Recorded Using Vivo Y38