 
                                У нас вы можете посмотреть бесплатно Jambatan Seri Saujana, Presint 4 Putrajaya | Seri Saujana Bridge, Putrajaya | Cruise Putrajaya (4k) или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
                        Если кнопки скачивания не
                            загрузились
                            НАЖМИТЕ ЗДЕСЬ или обновите страницу
                        
                        Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
                        страницы. 
                        Спасибо за использование сервиса ClipSaver.ru
                    
The Seri Saujana Bridge is a main bridge in the planned city Putrajaya, Malaysian federal territory and administrative centre. The bridge's design is a unique combination of a symmetric cable-stayed structure and a through-arch bridge; the through-arch bridge portion is reminiscent of a slender version of the Sydney Harbour Bridge in Sydney, New South Wales, Australia. The Seri Saujana bridge, also called Bridge No 8, crosses Putrajaya Lake, an artificial lake made to provide natural cooling, and connects the Core Island (Precinct 4) to the Precinct 7 on Lebuh Sentosa highway. It is strategically located at the main entrance into the Core Island from the south, via the upgraded road (now Putrajaya-Cyberjaya Expressway) and Kuala Lumpur–Putrajaya Expressway, and links the Core Island, where the main government buildings are, with the Kuala Lumpur International Airport. The Seri Saujana bridge is a new concept of a symmetric cable-stayed through-arch bridge. The bridge was designed by Michael Yamout of PJSI consultants, a Malaysian consulting engineering and architecture firm, as part of series of ten bridges built to access the Core Island within the new governmental city of Putrajaya. The symmetric cable-stayed system consists of two A shape pylons, each inclined away from the main span at an angle of 78°, held by 10 pairs of back stays spread into two planes, and 22 main stay cables in one plane anchored on and pick up the middle spine of the main-span deck. The through-arch system, on the other hand, employs inclined hangers (from arches) anchored on and pick up the outer edges of the main-span deck. With support at the middle and the outer edges, the main-span bridge deck can be made relatively lightweight and slender. The bridge is controlled by the principal design parameters to reflect a transparent, elegant and futuristic slender looking structure, with an overall single span of 300m and total width of 32m. There are dual three lane carriageways. The deck level varies from RL 35.25m at abutment to RL 35m at centre of the bridge. The builder of this bridge was Road Builder (M) Sdn Bhd at a cost of US$20 million. It was opened on 31 May 2003. Jambatan Seri Saujana merupakan sebuah jambatan utama di Putrajaya. Jambatan ini merupakan jambatan jenis gerbang kabel-penahan. Jambatan ini siap dibina pada 31 Mei 2003 dengan kos USD 20 juta #putrajaya #bridge #malaysia #fawwazmedia ----------------------- Enchanted Forest by Alexander Nakarada | https://www.serpentsoundstudios.com Music promoted by https://www.free-stock-music.com Attribution 4.0 International (CC BY 4.0) https://creativecommons.org/licenses/...