У нас вы можете посмотреть бесплатно HCMC METRO #13 | Vietnam | Metro Ride From Thao Dien to Ben Thanh | Afternoon Ride | Hitachi | [HD] или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
HCMC METRO PRESENTS: The Ho Chi Minh City Metro (HCMC Metro, Vietnamese: Đường sắt đô thị Thành phố Hồ Chí Minh) is a rapid transit system in Ho Chi Minh City, the most populous city in Vietnam. The system currently consists of one operational line, Line 1 which opened on 22 December 2024 from Bến Thành Market to Eastern Bus Terminus. Additional lines are currently under construction or being planned. Line 1 is 19.7 km (12.2 mi) long with three underground stations (Bến Thành, Ho Chi Minh City Opera House, and Ba Son) and eleven elevated stations. The three stations above are Vietnam's first underground metro stations. Trains are designed to travel at up to 110 km/h (68 mph) on the elevated sections and up to 80 km/h (50 mph) underground. Further lines are under construction or planned, for a total length of 510 km (316.9 mi) (not including the length of LRT Line 11 and Line 12 for Cần Giờ)[2][3] As part of its inauguration, nine trains will initially run from 05:00 to 22:00 (UTC+07:00), with peak hour and off-peak frequencies of eight and twelve minutes, respectively. Based on the decision of the Ho Chi Minh City People's Council, the metro will remain free for the first 30 days of operation. Feeder bus lines connecting to Metro Line 1 will be free of charge from 1 January 2025, until the end of the metro's fare-free policy. However, in practice, the free bus fare policy was implemented earlier, starting on 22 December 2024, coinciding with the official operation of the metro line. So Today I'm Going To Metro During Afternoon Ride From Thao Dien All The Way To Ben Thanh and Strait to Ben Thanh Market. Timestamps: Intro: 0:00 Intro 0:23 Escalator 1:15 Ticket Barrier 1:56 Escalator 2:25 Waiting For Train at Platform 1 3:55 Train is Arrived at Platform 2 to Bound For Suoi Tien Terminal 6:23 Train is Arrived at Platform 1 to Bound For Ben Thanh Elevated Station: 7:25 Thao Dien Station 8:36 Tan Cang Station 10:40 Van Thanh Park Station Underground Station: 13:15 Ba Son Station 15:15 Saigon Opera House Station 17:09 Ben Thanh Station Outro: 18:43 Staircase 20:15 Ticket Barrier 22:15 Staircase 23:15 Ben Thanh Market 24:13 Outro Recording Date: April 6, 2025 Opening Requested Date: December 22, 2024 ホーチミンメトロ