Π£ Π½Π°Ρ Π²Ρ ΠΌΠΎΠΆΠ΅ΡΠ΅ ΠΏΠΎΡΠΌΠΎΡΡΠ΅ΡΡ Π±Π΅ΡΠΏΠ»Π°ΡΠ½ΠΎ Automatic Corner Spout Pouch Filling Sealing Machine Debugging Steps ΠΈΠ»ΠΈ ΡΠΊΠ°ΡΠ°ΡΡ Π² ΠΌΠ°ΠΊΡΠΈΠΌΠ°Π»ΡΠ½ΠΎΠΌ Π΄ΠΎΡΡΡΠΏΠ½ΠΎΠΌ ΠΊΠ°ΡΠ΅ΡΡΠ²Π΅, Π²ΠΈΠ΄Π΅ΠΎ ΠΊΠΎΡΠΎΡΠΎΠ΅ Π±ΡΠ»ΠΎ Π·Π°Π³ΡΡΠΆΠ΅Π½ΠΎ Π½Π° ΡΡΡΠ±. ΠΠ»Ρ Π·Π°Π³ΡΡΠ·ΠΊΠΈ Π²ΡΠ±Π΅ΡΠΈΡΠ΅ Π²Π°ΡΠΈΠ°Π½Ρ ΠΈΠ· ΡΠΎΡΠΌΡ Π½ΠΈΠΆΠ΅:
ΠΡΠ»ΠΈ ΠΊΠ½ΠΎΠΏΠΊΠΈ ΡΠΊΠ°ΡΠΈΠ²Π°Π½ΠΈΡ Π½Π΅
Π·Π°Π³ΡΡΠ·ΠΈΠ»ΠΈΡΡ
ΠΠΠΠΠΠ’Π ΠΠΠΠ‘Π¬ ΠΈΠ»ΠΈ ΠΎΠ±Π½ΠΎΠ²ΠΈΡΠ΅ ΡΡΡΠ°Π½ΠΈΡΡ
ΠΡΠ»ΠΈ Π²ΠΎΠ·Π½ΠΈΠΊΠ°ΡΡ ΠΏΡΠΎΠ±Π»Π΅ΠΌΡ ΡΠΎ ΡΠΊΠ°ΡΠΈΠ²Π°Π½ΠΈΠ΅ΠΌ Π²ΠΈΠ΄Π΅ΠΎ, ΠΏΠΎΠΆΠ°Π»ΡΠΉΡΡΠ° Π½Π°ΠΏΠΈΡΠΈΡΠ΅ Π² ΠΏΠΎΠ΄Π΄Π΅ΡΠΆΠΊΡ ΠΏΠΎ Π°Π΄ΡΠ΅ΡΡ Π²Π½ΠΈΠ·Ρ
ΡΡΡΠ°Π½ΠΈΡΡ.
Π‘ΠΏΠ°ΡΠΈΠ±ΠΎ Π·Π° ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΠ΅ ΡΠ΅ΡΠ²ΠΈΡΠ° ClipSaver.ru
#machine #debug #studyvideo #industrial 00:01 Bag holder adjustment and nozzle adjustment 01:48 All bag clamping pins are adjusted 16:00 Card filling gas shock adjustment 21:39 Test running filling parameters 22:55 Heat seal position description 24:01 Code adjustment 28:31 Filling parameters To ensure smooth operation and optimal performance of the Automatic Corner Spout Pouch Filling Sealing Machine, follow these debugging steps during machine setup or troubleshooting: 1. Power and Air Supply Check Confirm the machine is properly connected to the power source (check voltage and phase). Ensure compressed air supply is stable and meets the pressure requirements (typically 0.6β0.8 MPa). Inspect all emergency stop buttons and safety sensors before starting. 2. Pouch Loading System Test Manually load several pouches into the pouch magazine to check alignment and pickup mechanism. Adjust the suction cups and arm to ensure stable pouch grabbing and transfer. 3. Corner Spout Position Calibration Verify the spout orientation is correct for filling and sealing. Fine-tune the spout positioning cylinder and guide rail to align the spout precisely with the filling nozzle and sealing head. 4. Filling System Debugging Run the filling system with water or testing liquid to check for: Accurate filling volume. Dripping or splashing issues. Adjust filling nozzle position, timing, and anti-drip function as needed. 5. Heat Sealing Temperature and Time Setup Set the appropriate sealing temperature according to pouch material (e.g., 160β180Β°C for laminated films). Adjust sealing time and pressure to ensure leak-proof, wrinkle-free seals. 6. Sealing Head Alignment Ensure upper and lower sealing jaws are aligned correctly. Check for uneven pressure or misalignment which can cause poor sealing quality. 7. Pouch Discharge Mechanism Test Verify that filled and sealed pouches are discharged smoothly to the conveyor or collection bin. Adjust discharge timing if pouches are stacking or jamming. 8. Sensor and Alarm Testing Test photoelectric sensors for pouch presence, spout position, and filling alignment. Simulate faults to ensure alarm systems respond correctly (e.g., no pouch, low air pressure). 9. Trial Run and Fine Adjustment Run a small batch of actual production to observe machine stability. Make minor adjustments to filling volume, sealing parameters, and pouch alignment as needed. 10. Final Inspection and Confirmation Inspect final products for: Proper filling. Strong, centered seals. Correct pouch shape and appearance. Log settings and backup parameters for future use. More information: www.zonesuntech.com Email: [email protected]