У нас вы можете посмотреть бесплатно LZSTL8WSLP & LZSTL8WSSP Installation Video или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
(0:07) Next Generation EZ and LZ installation. (0:11) STEP 1: Remove (1) screw securing hanger bracket to cooler. (0:21) STEP 2: Lift up and pull hanger brackets away from coolers. (0:29) STEP 3: NOTE: Hanger brackets MUST be supported securely. Add fixture support carrier if wall does not provide adequate support. Anchor hanger securely to wall using all (6) 1/4" diameter mounting holes. IMPORTANT: For proper fit, 5-7/8" (150 mm) dimension from wall to centerline of trap must be maintained. (0:35) STEP 4: Pick up coolers and set onto hanger brackets. Be certain hanger brackets are engaged properly in the slots on the back of the coolers. (0:43) STEP 5: Remove (4) 5/16" lower front panel screws for each front panel. (0:54) STEP 6: Remove lower front panel from coolers. (1:02) STEP 7: Waste Line Plumbing Diagram (1:07) STEP 8: Install waste line plumbing connecting coolers. Also, connect bottle filler drain to main waste line drain. (1:14) STEP 9: Install trap to waste line making sure end of waste line fits into trap. IMPORTANT: If it is necessary to cut the drain, loosen the screw at the black rubber boot and remove tube. Check for leaks after reassembly. (1:21) STEP 10: Install (2) screws and washers (not supplied). Make sure the screws engage in a structural member. (1:26) STEP 11: Remove (2) mounting screws, holding bottle filler to wall bracket, with 5/32" Allen wrench or Torx T25 bit. NOTE: Do not discard mounting screws. They will be needed to secure bottle filler to mounting bracket. (1:36) STEP 12: Remove wall mounting plate from bottle filler. (1:45) STEP 13: Place wall plate against wall on top of basin. Center the wall plate side to side with the basin. Mark the (6) mounting holes with a pencil. (1:53) STEP 14: Place tape over wire harness connection to keep debris from falling into connection when drilling holes. (2:00) STEP 15: Secure wall plate using (6) 7/16" obround mounting holes (mounting bolts not included). Use appropriate fasteners for your wall type. (2:06) STEP 16: Install gasket on bottom of bottle filler tower with gasket support bracket, (2) washers and (2) screws. (2:18) STEP 17: Ensure 3/8" water line for bottle filler is fed through hole in basin. (2:27) STEP 18: Feed 3/8" water line behind brace on bottle filler. Connect to 3/8" John Guest fitting. (2:34) STEP 19: Connect wiring harness to top of cooler. Ensure that you have the pins lined up correctly. (2:43) STEP 20: Align bottle filler on top of basin. (2:53) STEP 21: Place bottle filler on the (4) J-hooks protruding from the wall mounting plate installed on wall. Make sure round boss in gasket fits in hole of basin. (3:02) STEP 22: Unroll wire harness to connect to filter board. (3:08) STEP 23: Connect wire harness to filter board. Ensure pins line up. (3:16) STEP 24: Connect push bar connections to each cooler. (3:23) STEP 25: Remove filter from carton. Remove protective cap and attach filter to filter head by firmly inserting into head and rotating filter clockwise. Ensure that blue label can be read when filter is installed. (3:32) STEP 26: RECOMMENDED WATER SUPPLY LOCATION 3/8 O.D. UNPLATED COPPER TUBE CONNECT STUB WITH SHUT OFF (BY OTHERS) 3" (76 mm) MAXIMUM OUT FROM WALL. Turn on water supply. (3:41) STEP 27: Inspect for leaks in both cooler and bottle filler. Fix all leaks before continuing. (3:48) STEP 28: Plug cooler power cord into wall outlet. (3:57) STEP 29: Replace (2) mounting screws, securing bottle filler to wall bracket, with 5/32" Allen wrench or Torx T25 bit. (4:07) STEP 30: GREEN LED light should illuminate on the bottle filler showing good filter status along with the LCD bottle counter. (4:14) STEP 31: Verify proper dispensing by placing cup, hand or any opaque object in front of sensor area and verify water dispenses. NOTE: The first initial dispenses might have air in the line which may cause a sputter. This will be eliminated once all air is purged from the line. (4:24) STEP 32: Replace coolers lower front panels. (4:33) STEP 33: Replace (4) 5/16 " lower front panel screws for each panel. (4:44) STEP 34: Units Are Now Ready For Use