У нас вы можете посмотреть бесплатно Sarai Kale Khan to Modipuram First Journey | Delhi to Meerut Namo Bharat update | Papa Construction или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
suggested video- Meerut Metro • Meerut Metro Opening soon | Delhi-Meerut R... Delhi-Meerut RRTS • Delhi-Meerut RRTS is Now Ready | Sarai Kal... Gurugram-Faridabad-Noida RRTS • Gurugram-Faridabad-Noida Namo Bharat | Gur... Delhi-Meerut-Haridwar RRTS • Delhi Meerut RRTS Corridor Extended to Har... --------------------------------------------------------- To subscribe the channel- / @papaconstruction Facebook Page- / papa.constrn Instagram- / papa_constrn Twitter- / papa_constrn Email- papa.constrn@gmail.com ---------------------------------------------------------- India’s fastest regional train is ready. We did the first journey experience on the upcoming Delhi–Meerut RRTS from Sarai Kale Khan Station to Modipuram before inauguration. In this video you will see ground report + exclusive drone footage showing stations, tracks, train interior and real travel experience. This corridor will drastically reduce travel time and connect NCR like a single metro city — a massive boost for daily commuters and property investors. Papa Construction always brings the latest infrastructure & development updates first. The Delhi–Meerut Regional Rapid Transit System (Delhi–Meerut RRTS) is an 82.15 km (51.05 mi) long, semi-high speed rail corridor currently under construction which will connect Delhi, Ghaziabad, and Meerut. It is one of the three rapid rail corridors planned under Phase I of the Regional Rapid Transit System (RRTS) project managed by the National Capital Region Transport Corporation (NCRTC). With a maximum speed of 180 km/h (111.85 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project will cost ₹30,274 crore (US$3.8 billion) and will have 24 stations, including two depots at Duhai and Modipuram. Length of the corridor: 82 km (51 mi) No. of stations: 14 Names of stations: Sarai Kale Khan, New Ashok Nagar, Anand Vihar, Sahibabad, Ghaziabad, Guldhar, Duhai, Muradnagar, Modinagar South, Modinagar North, Meerut South, Shatabdi Nagar, Begumpul and Modipuram. No. of depots: 2 Names of depots: Duhai and Modipuram. 8 stations were constructed exclusively for local transit services in Meerut: Partapur, Rithani, Brahmapuri, Meerut Central, Bhaisali, MES Colony, Daurli and Meerut North. 4 stations for which both RRTS and local transit services in Meerut will be provided: Meerut South, Shatabdi Nagar, Begumpul and Modipuram. Of the entire length, 68.03 km (42.27 mi) is elevated, 14.12 km (8.77 mi) is underground. and 1.45 km (0.90 mi) will be at grade for connections to two depots to be located at Duhai and Modipuram. In densely populated areas of Delhi and Meerut the route will be underground including near the Yamuna river. The entire route is designed for a maximum speed of 180 km/h (111.85 mph), with an operating speed of 160 km/h (99.42 mph). The average speed (when taking stops into account) will be approximately 100 km/h (62.14 mph). #RRTS #DelhiMeerutRRTS #NaMoBharat #RapidRail #NCRDevelopment #InfrastructureIndia #Meerut #Delhi #TransportUpdate #RealEstateGrowth #PapaConstruction