http://www.awe.com.au/ Replacing Existing Weighbridge at Kimbriki Resource Recovery Centre Kimbriki Resource Recovery Centre, also know as Kimbriki Tip, which is situated in a valley, at Terrey Hills on the Northern Beaches of Sydney. All Commercial loads must use Weighbridges From the 1st of July All Commercial Loads must be weighed on entering Kimbriki tip at Weighbridge 1 & as they Exit using weighbridge 2. Replace the Old No 2 Weighbridge Kimbriki tips needed to replace the old No 2 Weighbridge, without interfering with the tips operations. Kimbriki Tip's Problem The Weighbridge is cut into a Valley Wall, so access is difficult. Concrete Weighbridge Deck require 30 days to cure The new Weighbridge will have a concrete deck, which means it need to cure for 30 days to reach a Minimum Strength of 32mpa before it can be used. As in accordance with Australian Standards AS360 Minimise Downtime of 2nd Weighbridge Kimbriki Tip could not afford to have the 2nd weighbridge out of action for more than 30 days, while it waited for the concrete to cure Build Weighbridge in Another Location To reduce the Kimbriki Tip's downtime, AWE built the weighbridge onsite, but in another location. Kimbriki Tip's operations would not be hindered while the concrete deck cured. Freight Weigh Weighbridge built to last Awe is installing a 20m long x 3.5m wide Freight Weigh Above Ground Weighbridge at Kimbriki Tip. The weighbridge will be built in 2 section, each weighing over 30 tonnes. The Freight Weigh Weighbridge Built To Last, with it's 600mm Steel UBeams modular structural frame, designed to minimise bending & reduces extreme flexing when loaded. There's Cross bracing every 5 metres, to prevent twisting AWE Galvanise all steel frames & components, to protect your weighbridge from corrosion. Pouring the Concrete Deck of The Weighbridge Once the Weighbridge's steel frame has been assembled, it ready for the concrete. Then the concrete has to cure for 30 days, at another location, onsite. 1 Day to Remove & Replace Old Weighbridge The goal was to remove the old weighbridge and replaced it with the Fright Weigh Weighbridge, in 1 day. These are the steps taken.... So now the weighbridge operators, can see the trucks Weight and calculate the fee to be charged. The new 20m x 3.5m Freight Weigh Weighbridge was installed in 1 only day The Weighbridge was calibrated the next day, and was ready to start collecting money, by 10:00 o'clock the next morning. To make sure the this is the right Product to suit your products needs, you should talk to AWE Group sales engineers On 02 8717 3333 Or Go To www.awe.com.au