У нас вы можете посмотреть бесплатно How Marine Loading Arms Are Constructed? | Offshore Animation или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Marine loading arms are highly specialized pieces of equipment used to transfer liquids or gases between shore-based storage facilities and ships or barges. Constructing marine loading arms involves several stages, from design and engineering to manufacturing, assembly, and testing. 1. Design and Engineering: **Initial Design**: Determining the basic design specifications based on the types of liquids or gases to be transferred, the environmental conditions, and the requirements of the specific application. Detailed Engineering: Creating detailed engineering drawings and specifications. This includes mechanical design, structural analysis, hydraulic calculations, and material selection. Simulation and Modeling: Using software to simulate the operation of the loading arm under various conditions to optimize the design and ensure reliability. 2. Procurement Materials Selection: Choosing materials that can withstand the operational environment, including exposure to corrosive substances, extreme temperatures, and mechanical stresses. Vendor Selection: Identifying and selecting suppliers for components such as swivels, joints, hydraulic systems, and control systems. 3. Manufacturing Component Fabrication: Manufacturing the various components of the loading arm, including pipes, swivel joints, balance mechanisms, and hydraulic cylinders. Quality Control: Inspecting components for quality and conformity to specifications. This includes non-destructive testing (NDT) methods like X-ray, ultrasonic testing, and pressure testing. 4. Assembly Pre-Assembly: Assembling sub-components in a controlled factory environment. This includes welding, machining, and fitting components together. Main Assembly: Assembling the main structure of the loading arm, including mounting swivel joints, balance mechanisms, and hydraulic systems. Integration: Integrating control systems, sensors, and safety devices. This may include electronic control units, emergency release systems, and communication interfaces. 5. Testing Hydraulic Testing: Testing the hydraulic systems to ensure proper operation and leak-free performance. Mechanical Testing: Testing the mechanical components for strength, flexibility, and durability. Operational Testing: Simulating real-world operations to ensure the loading arm functions correctly. This includes range-of-motion tests, balance checks, and response to control inputs. Safety Testing: Verifying that safety features such as emergency release systems and alarms function as intended. 6. Transportation and Installation Disassembly for Transport: Disassembling the loading arm into transportable sections, if necessary, for shipping to the installation site. Transportation: Transporting the components to the port or terminal where the loading arm will be installed. On-Site Assembly: Reassembling the loading arm on-site and mounting it to the designated support structure. Connection to Utilities: Connecting the loading arm to hydraulic power units, control systems, and any other necessary utilities. 7. Commissioning Final Testing: Conducting final tests on-site to ensure proper installation and functionality. This includes operational tests with actual transfer media, safety checks, and system calibration. Training: Training operators and maintenance personnel on the proper use and upkeep of the loading arm. Handover: Officially handing over the loading arm to the operational team with all necessary documentation and certifications. 8. Maintenance and Inspection **Regular Maintenance**: Establishing a maintenance schedule to ensure the loading arm remains in good working condition. About International Energy Club International Energy Club is a world-renowned offshore animation studio known for its commitment to excellence and innovation in visual storytelling. With a diverse portfolio spanning various genres and mediums, the studio continues to captivate audiences worldwide with its captivating animations. To know more about us & our capabilities in the field of offshore, marine & subsea animations, you can visit our website. http://www.internationalenergyclub.com/ 🔔 Don’t forget to like, comment, and subscribe to our channel for more animations showcasing the latest innovations in offshore, marine, and subsea industries! #OffshoreAnimation #offshorewind #3danimation #offshore #animationvideo #subsea #energy #offshoreanimation #vessel #SubseaTechnology #trainingvideo #marinetechnology #InternationalEnergyClub #oilandgas #repairing #oilrigs #oilrig #rigmove #offshoredrilling #drillinganimation #animation #drillingrig #oilwell #miling #oilrefinery #oilrefining #marineloadingarm #MLA #loadingandunloading #loadingarm #tankeroffloading #storagetanks #storagetank #svt #SVTloadingarm #trainloadingarm #truckloading #oilterminal #loadingarmInstallation #loadingarmConstruction