У нас вы можете посмотреть бесплатно HS2 Delta Junction viaduct - March 2025 или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
This aerial drone footage captures the latest construction progress of the HS2 Delta Junction Viaduct near Coleshill, as of the end of March 2025. The video provides a clear overview of the ongoing work and the scale of this key section within the HS2 works. You can see the new piers being built by the side of the M6 motorway as well as the progress at the segment building machine. Thanks @isaac.raskin for the timeline highlights: 00:00 Looking east over the M42/M6 Toll at the piers for the Water Orton Viaducts, the Chattle Hill Box Structure can be seen in the background 00:15 Looking southwest in the opposite direction of where the previous clip ended, Marsh Lane Embankment is under construction beyond the last pier/abutment 00:19 Facing east again at the Water Orton No. 1 Viaduct, this will take trains from the North to Birmingham 00:21 Water Orton No. 2 Viaduct, this will take trains from Birmingham to the North 00:56 Parts of the Watton House West Viaduct and Watton House East Viaduct are having their deck beams installed to the right of centre 01:15 The taller Water Orton No. 1 Viaduct will go over the main line using "straddle bents"; pairs of piers with steel beams between them that will carry the deck 01:30 River Tame West Viaduct, this is divided into 2 section with 1 carrying 1 track and the other carrying 2 tracks, the deck for the 1 track section was completed in Feb 2025 01:45 The steel beams for the straddle bents can be seen in the background to the left 02:03 (L-R): Shorter piers for the Water Orton No. 2 Viaduct, the deck started being built out from the Curdworth Viaduct in Feb 2025, Piers for the 2 track section of the River Tame Viaduct West 1 track section of the River Tame West Viaduct Taller piers for the Water Orton No. 1 Viaduct, the first few spans were built in situ with the Curdworth Viaduct, the rest of the spans started just after No. 2 with a second swivel crane Piers for the River Tame East are still being constructed 02:24 Curdworth Viaduct where the Water Orton No. 2 Viaduct and River Tame Viaduct West join 02:35 Faraday Avenue Embankment 02:38 Looking east over the completed deck for the River Tame Viaduct West 04:40 A better look at the abutments where the River Tame Viaduct West will meet the Watton House Embankment 04:45 A closer look at the straddle bents, the main line will run between these piers on the embankment over the extra reinforcement you can see here 05:02 The southern abutments of the Watton House Embankment where the 2 Watton House Viaducts will connect