У нас вы можете посмотреть бесплатно Integrated Construction Practices (IPD + BIM + LEAN) - Mixed Use Commercial Project или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
Integrated Project Delivery (IPD) + Building Information Modelling (BIM) + LEAN construction practices in a Mixed Use Commercial Project in India CEPT University Faculty: Faculty of Technology (PG) Course: Masters in Construction Engineering and Management: Sem - III (Monsoon 2020) Project by: Aum Karkar Guided by: Dr. Jyoti Trivedi, Dr. Bhargav Dave Project: Mixed Use Commercial Project This video is a compilation of tasks conducted during Studio-III of M.CEM - 'Integrated Construction Practices' for a Mixed Use Commercial Project in India (name not to be disclosed). The studio focuses on the integration of BIM and Lean practices in the AEC industry. A 3D Revit model is prepared from 2D CAD drawings for the process of clash detection and quantity take-off. Design Optimization using Value Engineering is also performed. The site layout is critically analyzed using a 3D model to find the shortcomings and suggest improvements. A 4D construction sequence of the planned activities is created using Autodesk Navisworks Manage and Bentley Synchro Pro, along with a 5D simulation to analyze the cost incurred. The processes throughout the studio are observed, criticized and improvement for reduction of lean wastes have been suggested to increase the efficiency of the processes. Each of the group members was assigned the different roles of Architectural Consultant, Structural Consultant, Mechanical Consultant, Plumbing & Fire-Fighting Consultant, and Contractor. All the members together formulated the BIM Execution Plan for the project identifying the formats, meetings, and BIM goals. My role in the group: Structural consultant, Contractor and, BIM Coordinator My responsibilities include: BIM Execution Plan Site layout model LOD 200 Structural modeling LOD 300 Resolution of RFIs Quantity Take-off 4D Simulation Cost estimation (5D) Topics covered in the video are: Project Introduction Structural Modelling Quantity Take-off Progress Monitoring and tracking (LPS, Impact matrix, and Waste matrix) Design Structure Matrix BIM Return on Investment for the project 4D Simulation 5D Simulation (including planned vs actual) VR Walkthrough