• ClipSaver
  • dtub.ru
ClipSaver
Русские видео
  • Смешные видео
  • Приколы
  • Обзоры
  • Новости
  • Тесты
  • Спорт
  • Любовь
  • Музыка
  • Разное
Сейчас в тренде
  • Фейгин лайф
  • Три кота
  • Самвел адамян
  • А4 ютуб
  • скачать бит
  • гитара с нуля
Иностранные видео
  • Funny Babies
  • Funny Sports
  • Funny Animals
  • Funny Pranks
  • Funny Magic
  • Funny Vines
  • Funny Virals
  • Funny K-Pop

University of New Hampshire Water Treatment Plant Design-Build Project скачать в хорошем качестве

University of New Hampshire Water Treatment Plant Design-Build Project 3 года назад

скачать видео

скачать mp3

скачать mp4

поделиться

телефон с камерой

телефон с видео

бесплатно

загрузить,

Не удается загрузить Youtube-плеер. Проверьте блокировку Youtube в вашей сети.
Повторяем попытку...
University of New Hampshire Water Treatment Plant Design-Build Project
  • Поделиться ВК
  • Поделиться в ОК
  •  
  •  


Скачать видео с ютуб по ссылке или смотреть без блокировок на сайте: University of New Hampshire Water Treatment Plant Design-Build Project в качестве 4k

У нас вы можете посмотреть бесплатно University of New Hampshire Water Treatment Plant Design-Build Project или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:

  • Информация по загрузке:

Скачать mp3 с ютуба отдельным файлом. Бесплатный рингтон University of New Hampshire Water Treatment Plant Design-Build Project в формате MP3:


Если кнопки скачивания не загрузились НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу страницы.
Спасибо за использование сервиса ClipSaver.ru



University of New Hampshire Water Treatment Plant Design-Build Project

The University of New Hampshire (UNH) owns and is responsible for operations of a water treatment plant (WTP) that serves the entire campus as well as the Town of Durham, NH. The University replaced the aging facility with an efficient, state-of-the-art, 26,000-square-foot WTP designed to treat and deliver up to two million gallons of high-quality drinking water per day. The new plant, delivered under a collaborative design-build contract, is the first of its kind in New Hampshire and features a unique treatment process designed to accommodate three very different source waters, as well as a significant population flux. UNH has upwards of 13,000 undergraduate students on campus between September and May, adding to Durham’s year-round population of approximately 16,500. The new WTP sits adjacent to College Woods, a 250-acre area of woods, streams, and fields used by UNH and area residents for recreation and research. The design team took care in situating the facility to minimally impact the natural resources. While the new plant required some trees to be cut, the team coordinated with the University’s facilities staff to properly balance protection of existing trees with space requirements for the new WTP. While the plant’s design had to maintain the same treatment capacity, the new facility was designed to have full redundancy of all equipment and provide enough space to facilitate maintenance and operations for the foreseeable future. Woodard & Curran designed the new treatment building with a capacity of 2.0 million gallons per day (MGD). The facility is equipped with three residuals lagoons, an open process area that is visible through interior windows, and a training lab for engineering students to perform experiments. Unlike the old facility, the new plant site is located above the 100-year flood plain and will better handle the varied range of water characteristics from the three water sources. The new treatment process includes rapid mix, flocculation, plate-settler clarification, multi-media filtration, and disinfection. Additionally, there is corrosion control, pH adjustment, and fluoridation. There is also a supplemental chemical feed system and multiple dosing points for seasonal manganese treatment using potassium permanganate. Below grade, concrete tanks include two backwash supply tanks from which water is pumped for filter backwashing operations, two disinfection contact time tanks and three independent clearwells, all of which provides significant redundancy in the overall treatment process. The design-build approach allowed for stakeholder input throughout the project. The campus planning department reviewed iterations of conceptual designs, constructability reviews were conducted by the general contractor and operability reviews were performed by both Woodard & Curran’s operations group and existing UNH WTP operations staff. Throughout the entire project, this process was fully transparent with close collaboration between the University, owner’s project manager, and design-build team. The project was expedited by the alternative delivery method with construction starting as final design details were finalized, which also reduced the amount of time the old facility needed to remain operational. As construction neared completion, UNH elected to engage a contract operator for the new facility. After an additional procurement stage, the project effectively turned from a design-build delivery into a design-build-operate contract with Woodard & Curran’s operations and management team assuming the contract. The existing relationship allowed for an easy transition of operations staff under the Woodard & Curran umbrella from the old facility to the new facility, which began distributing reliable, high quality water in March 2020.

Comments
  • Wastewater Treatment Plant Virtual Tour 4 года назад
    Wastewater Treatment Plant Virtual Tour
    Опубликовано: 4 года назад
  • UNH Design-Build Water Treatment Facility 3 года назад
    UNH Design-Build Water Treatment Facility
    Опубликовано: 3 года назад
  • Spray Dryer Overview 12 дней назад
    Spray Dryer Overview
    Опубликовано: 12 дней назад
  • Понимание и анализ ферм 5 лет назад
    Понимание и анализ ферм
    Опубликовано: 5 лет назад
  • System Design Concepts Course and Interview Prep 1 год назад
    System Design Concepts Course and Interview Prep
    Опубликовано: 1 год назад
  • Почему опреснение воды так сложно? 2 года назад
    Почему опреснение воды так сложно?
    Опубликовано: 2 года назад
  • Part 1 - Sewer Collection Systems - Gravity vs Low-Pressure - Evaluating Your Options 5 лет назад
    Part 1 - Sewer Collection Systems - Gravity vs Low-Pressure - Evaluating Your Options
    Опубликовано: 5 лет назад
  • Council Meeting - January 14, 2026 Трансляция закончилась 11 дней назад
    Council Meeting - January 14, 2026
    Опубликовано: Трансляция закончилась 11 дней назад
  • Для Чего РЕАЛЬНО Нужен был ГОРБ Boeing 747? 2 месяца назад
    Для Чего РЕАЛЬНО Нужен был ГОРБ Boeing 747?
    Опубликовано: 2 месяца назад
  • Wastewater Treatment Plant Construction Tour | May 2024 1 год назад
    Wastewater Treatment Plant Construction Tour | May 2024
    Опубликовано: 1 год назад
  • Градиентный спуск, как обучаются нейросети | Глава 2, Глубинное обучение 8 лет назад
    Градиентный спуск, как обучаются нейросети | Глава 2, Глубинное обучение
    Опубликовано: 8 лет назад
  • Как работает очистка городской воды: питьевая и сточная вода 4 года назад
    Как работает очистка городской воды: питьевая и сточная вода
    Опубликовано: 4 года назад
  • Как на самом деле работают скважины и водоносные горизонты 3 года назад
    Как на самом деле работают скважины и водоносные горизонты
    Опубликовано: 3 года назад
  • Невероятные свойства композитных материалов 2 года назад
    Невероятные свойства композитных материалов
    Опубликовано: 2 года назад
  • Sequencing Batch Reactor (SBR) - Parkson's EcoCycle 6 лет назад
    Sequencing Batch Reactor (SBR) - Parkson's EcoCycle
    Опубликовано: 6 лет назад
  • КОНЕЦ РЫНКА НЕДВИЖИМОСТИ В 2026? Что ждет россиян в новом году 2 дня назад
    КОНЕЦ РЫНКА НЕДВИЖИМОСТИ В 2026? Что ждет россиян в новом году
    Опубликовано: 2 дня назад
  • Понимание инженерных чертежей 3 года назад
    Понимание инженерных чертежей
    Опубликовано: 3 года назад
  • Но что такое нейронная сеть? | Глава 1. Глубокое обучение 8 лет назад
    Но что такое нейронная сеть? | Глава 1. Глубокое обучение
    Опубликовано: 8 лет назад
  • Проблема с ветроэнергетикой 1 год назад
    Проблема с ветроэнергетикой
    Опубликовано: 1 год назад
  • Wastewater Treatment Plant Tour - 15 лет назад
    Wastewater Treatment Plant Tour - "Flush To Finish"
    Опубликовано: 15 лет назад

Контактный email для правообладателей: u2beadvert@gmail.com © 2017 - 2026

Отказ от ответственности - Disclaimer Правообладателям - DMCA Условия использования сайта - TOS



Карта сайта 1 Карта сайта 2 Карта сайта 3 Карта сайта 4 Карта сайта 5