У нас вы можете посмотреть бесплатно COLOSSAL TRAIN MEET — Thunder Cab vs GEVO! или скачать в максимальном доступном качестве, видео которое было загружено на ютуб. Для загрузки выберите вариант из формы ниже:
Если кнопки скачивания не
загрузились
НАЖМИТЕ ЗДЕСЬ или обновите страницу
Если возникают проблемы со скачиванием видео, пожалуйста напишите в поддержку по адресу внизу
страницы.
Спасибо за использование сервиса ClipSaver.ru
A colossal meet deep in Walker Canyon — UP 8392 leading a heavy eastbound manifest with a full six‑unit Thunder Cab lash‑up on the point, assisted by a single trailing DPU for seven units total, as it goes head‑to‑head with BNSF 7864 on a fully loaded westbound ethanol train. Two trains, two personalities, one perfectly timed canyon showdown. Union Pacific’s six‑unit head‑end set brings that unmistakable SD70ACe Thunder Cab rumble — deep bass, heavy vibration, and pure AC‑traction muscle grinding upgrade with tonnage. Behind them, a lone rear DPU adds steady shove through the canyon’s curves. On the other side, BNSF 7864 eases downgrade in full dynamics, holding back a long string of loaded ethanol tanks. Its consist is just as interesting: two lead units with three trail DPUs, a five‑unit power set working hard to keep the heavy ethanol train under control on the descent. Classic GEVO chuff, DC‑traction grit, and a whole lot of braking effort echoing off the canyon walls. As the trains lined up, the conductor even spotted Buddy and threw him a wave — one of those small, real railfan moments you just can’t script. Shot in the heart of Walker Canyon, one of Southern California’s most dramatic railroad locations, where the tracks carve through rugged hillsides, golden rock faces, and wide‑open desert light. No filters, no artificial color — just the canyon’s natural tones and the raw sound of two heavy freights meeting in perfect timing. Power: • UP 8392 — SD70ACe (Thunder Cab), heavy eastbound manifest • UP consist: 6 lead + 1 trail DPU = 7 units total • BNSF 7864 — GE ES44DC (GEVO), fully loaded ethanol train • BNSF consist: 2 lead + 3 trail DPUs = 5 units total Captured in 4K with a focus on authenticity, atmosphere, and the natural acoustics of the canyon. Members get early access, with the full public release scheduled for 10 AM.